Joined
·
9,359 Posts
really............. this is what the "plumber" came up with for "hooking up the sink" ????!!!!???? jeezus and people wonder why I know people are fucking morons and should be eliminated from society!
How the fuck is that, "hey your sink is all good to go"........bad enough you ran it through 2 shelves but you didn't even get it over to the fucking sink nor did you attach it to the fucking faucet!!!
I called and bitched and was told I need to buy a short hose to get it over to the sink.....wtf---FUCK YOU NO !!!
a couple views of some lackluster efforts of late and severe lack of progress as a result
I can't even get my parts unboxed until that water bullshit is moved so I can install those 2 shelves........... been like this for 5 days now, wtf!!!
to top that off, 3 times I have gone up there and not been able to gain entry, the sun heats up the door and the concrete and the door bows in the middle putting so much pressure on the striker plate you cannot get the key to turn...... twice I have been able to go in upstairs and walk down the stairs and then go in through the hallway door, but what a fucking time waster and joke...............
it needs a new door installed is what it needs, there is no gap to the sillplate (which is not rusty as it is all aluminum but it is sitting right on the concrete and all 3 bolts raised out of the concerte- one snapped off when I tried to turn it in so it was not sticking up the 3/8" trip hazzard amount) nor to the top of the steel frame (less than 1/16 in the early am before the sun hits it) neither are moveable and the frame and the door have a severe case of rust
and the excuse........... we never had any problems before it must be becasue of the extreme heat we are having......like get real, every fucking year we see on average 14 days in the 90's.....you can't tell me those days for the past 30 years you didn't have issues if that is the only issue!
anyways...........
Everything is out of the old place, but most of it is sitting in my own garage now or still inside the enclosed trailer and some in my fucking foyer...
on top of this bullshit stupidity........... I get told now the office space I wanted may be Sept 1, may be longer......... really wtf........ (deadbeat tennant has nothing in there except a massage table, no sheets nothing else but that table.......move it out!!!) it was sold to me as being "350sf" but I went in and saw it and it is no more than 225-250sf total and split down the middle into what was 2 massage rooms about 7-8 wide max by perhaps 13 or 14 long
So they offer me a much bigger (like over 800sf total) office that is in fact empty, but it is missing a side wall (maybe 13' long at 8' high to stud and sheetrock and paint)
I said you know what, just give me the big office space as fast as you can and for $290 more per month more than the small office I will do that deal...(easily triple the sf compared to that smaller space)... ($110 less than they wanted for the "big office")......... figuring that is a couple days work and that I should pay less than their ask as I am signing on for 3 years as an already existing tennant and they don't have to make yet another sign, or do any "build out" or deal with somebody else who may be gone in 1 year etc.... (I know I could get it done solo in about 10 man hours spread over 2 or 3 days, fuck....... tin studs and sheetrock and you are taping and first coating in under 5 hours--- next day 2nd coat of mud, later that day top coat and next day paint...boom done.... 3 days tops)
So they accepted my offer and said "we talked it over and okay, we agree to your terms, when do you want to sign a new contract", then tell me they think they can have it ready for me by Sept 1.......... wtf!!!
I just want to be done moving and get shit fucking set up and be working again............MOVING SUCKS!!!! idiots SUCK because they make the moving even more unneccessarily painful and slow!!
This is the exact reason moving a motorcycle business needs to be done in fucking december and january and february.......nothing else to do those months!........ but this place came available when it came available and I am sure I could not have waited to jump on it til then.............ugggg
The real question is once I get the office/showfloor space of approx 800+sf, how to use it........... it has an approx 14x14 office within this space
it has a concrete and stone greeting area (chest high with a nice top and all stone surround, in an "L"...perhaps 8' wide and 6' back) with a desk area behind that.......like where a receptionist would sit with all their stuff
there is still about 10' behind that desk area and about 20' over to the west of that greeting area......... there is easily 500+sf of empty unused floorspace up there
I mean I will likely stick my trackbike in there just to fill space and display a motorcycle, and likely stick a few motorcycle tire displays out to showcase perhaps the latest offerings from Dunlop, Metzeler and Pirelli. maybe Michelin too--I have not really stocked Michelins in 30 years, but might now???????
but otherwise what??????? tons of empty walls
the south wall is a bank of windows about 50' wide up about 40" off the ground (all stone under those just like the greeting area)
But since I don't sell parts retail nor any accesories and zero intentions of ever doing that again......wtf to do with the extra space???
the office walls will be lined with my motorcycle pictures and perhaps some of my ancient trophies from the 80's and 90's but even then it doesn't fill even one wall..............that 14x14 office is more than twice the space I require for an office, hell I could put 3 motorcycles in there and still have too much room (too bad the entries are not conducive to motorcycle storage upstairs, and likely niether is the insurance policy
I will see if I can get back into the space come Monday and take a couple pictures.......... I have to meet them and push them on getting shit done and fixed, there is the outlet where my tire machine goes that doesn't work as well....
2 97 GSXR750's
1- 04 era R1
1- 89 GL1500 gold wing ding
1- honda shadow
and that rattrap old ass GS650G?
still have 6 more bikes to move into the space
70 tires thus far up on the tire rack, room for atleast 30 more---which is good since I may have that many now stacked in my foyer............ about half the brake pads are up the gridwall---but until the shelves are all in I cannot put the gridwall on the other end to hang the rest of the brake pads
Huge circle jerk of bullshit.......... and nobody seems to care but me.........
oh did I mention....... those shotty waterconnections drip, thus the bucket under it all........uggg---yeah great "plumber" they had do this
What also pissed me off about this bullshit, they did not ask my permission to enter my space!
been some discussion about that since, but if I am not there you need to get ahold of me ask, not just go in!!!!!!!! fucking A.....
How the fuck is that, "hey your sink is all good to go"........bad enough you ran it through 2 shelves but you didn't even get it over to the fucking sink nor did you attach it to the fucking faucet!!!
I called and bitched and was told I need to buy a short hose to get it over to the sink.....wtf---FUCK YOU NO !!!
a couple views of some lackluster efforts of late and severe lack of progress as a result
I can't even get my parts unboxed until that water bullshit is moved so I can install those 2 shelves........... been like this for 5 days now, wtf!!!
to top that off, 3 times I have gone up there and not been able to gain entry, the sun heats up the door and the concrete and the door bows in the middle putting so much pressure on the striker plate you cannot get the key to turn...... twice I have been able to go in upstairs and walk down the stairs and then go in through the hallway door, but what a fucking time waster and joke...............
it needs a new door installed is what it needs, there is no gap to the sillplate (which is not rusty as it is all aluminum but it is sitting right on the concrete and all 3 bolts raised out of the concerte- one snapped off when I tried to turn it in so it was not sticking up the 3/8" trip hazzard amount) nor to the top of the steel frame (less than 1/16 in the early am before the sun hits it) neither are moveable and the frame and the door have a severe case of rust
and the excuse........... we never had any problems before it must be becasue of the extreme heat we are having......like get real, every fucking year we see on average 14 days in the 90's.....you can't tell me those days for the past 30 years you didn't have issues if that is the only issue!
anyways...........
Everything is out of the old place, but most of it is sitting in my own garage now or still inside the enclosed trailer and some in my fucking foyer...
on top of this bullshit stupidity........... I get told now the office space I wanted may be Sept 1, may be longer......... really wtf........ (deadbeat tennant has nothing in there except a massage table, no sheets nothing else but that table.......move it out!!!) it was sold to me as being "350sf" but I went in and saw it and it is no more than 225-250sf total and split down the middle into what was 2 massage rooms about 7-8 wide max by perhaps 13 or 14 long
So they offer me a much bigger (like over 800sf total) office that is in fact empty, but it is missing a side wall (maybe 13' long at 8' high to stud and sheetrock and paint)
I said you know what, just give me the big office space as fast as you can and for $290 more per month more than the small office I will do that deal...(easily triple the sf compared to that smaller space)... ($110 less than they wanted for the "big office")......... figuring that is a couple days work and that I should pay less than their ask as I am signing on for 3 years as an already existing tennant and they don't have to make yet another sign, or do any "build out" or deal with somebody else who may be gone in 1 year etc.... (I know I could get it done solo in about 10 man hours spread over 2 or 3 days, fuck....... tin studs and sheetrock and you are taping and first coating in under 5 hours--- next day 2nd coat of mud, later that day top coat and next day paint...boom done.... 3 days tops)
So they accepted my offer and said "we talked it over and okay, we agree to your terms, when do you want to sign a new contract", then tell me they think they can have it ready for me by Sept 1.......... wtf!!!
I just want to be done moving and get shit fucking set up and be working again............MOVING SUCKS!!!! idiots SUCK because they make the moving even more unneccessarily painful and slow!!
This is the exact reason moving a motorcycle business needs to be done in fucking december and january and february.......nothing else to do those months!........ but this place came available when it came available and I am sure I could not have waited to jump on it til then.............ugggg
The real question is once I get the office/showfloor space of approx 800+sf, how to use it........... it has an approx 14x14 office within this space
it has a concrete and stone greeting area (chest high with a nice top and all stone surround, in an "L"...perhaps 8' wide and 6' back) with a desk area behind that.......like where a receptionist would sit with all their stuff
there is still about 10' behind that desk area and about 20' over to the west of that greeting area......... there is easily 500+sf of empty unused floorspace up there
I mean I will likely stick my trackbike in there just to fill space and display a motorcycle, and likely stick a few motorcycle tire displays out to showcase perhaps the latest offerings from Dunlop, Metzeler and Pirelli. maybe Michelin too--I have not really stocked Michelins in 30 years, but might now???????
but otherwise what??????? tons of empty walls
the south wall is a bank of windows about 50' wide up about 40" off the ground (all stone under those just like the greeting area)
But since I don't sell parts retail nor any accesories and zero intentions of ever doing that again......wtf to do with the extra space???
the office walls will be lined with my motorcycle pictures and perhaps some of my ancient trophies from the 80's and 90's but even then it doesn't fill even one wall..............that 14x14 office is more than twice the space I require for an office, hell I could put 3 motorcycles in there and still have too much room (too bad the entries are not conducive to motorcycle storage upstairs, and likely niether is the insurance policy
I will see if I can get back into the space come Monday and take a couple pictures.......... I have to meet them and push them on getting shit done and fixed, there is the outlet where my tire machine goes that doesn't work as well....
2 97 GSXR750's
1- 04 era R1
1- 89 GL1500 gold wing ding
1- honda shadow
and that rattrap old ass GS650G?
still have 6 more bikes to move into the space
70 tires thus far up on the tire rack, room for atleast 30 more---which is good since I may have that many now stacked in my foyer............ about half the brake pads are up the gridwall---but until the shelves are all in I cannot put the gridwall on the other end to hang the rest of the brake pads
Huge circle jerk of bullshit.......... and nobody seems to care but me.........
oh did I mention....... those shotty waterconnections drip, thus the bucket under it all........uggg---yeah great "plumber" they had do this
What also pissed me off about this bullshit, they did not ask my permission to enter my space!
been some discussion about that since, but if I am not there you need to get ahold of me ask, not just go in!!!!!!!! fucking A.....
Attachments
-
1.9 MB Views: 3
-
1.5 MB Views: 3
-
2 MB Views: 3
-
1.4 MB Views: 3
-
2.1 MB Views: 3